Start-up
Multi-bypass modular UPS  
Proceed in the following order:
– check that switches Q1, Q4S, Q5N and QF1 on the UPSs are open and that switches Q3BP are closed, otherwise set them 
to the required position;
– close the upstream switches (on the low-voltage switchboard) supplying power to the Mains 1 and Mains 2 inputs 
on the UPSs, the load is supplied with power;
– close the Mains 1 input switch Q1 on the UPSs to supply them with power:
– red "load not protected" light
on the control panels of the UPSs goes on:
– the rectifier/chargers automatically start;
– close the Mains 2 input switch Q4S on the UPSs:
– close inverter output switch Q5N on the UPSs:
– close battery circuit breaker QF1 on the UPSs:
– open maintenance bypass switch Q3BP on the UPSs:
– the load is now supplied by the Mains 2 input via the static switches of the UPSs.
– press the "inverter on" button
 on the control panel of each UPSs:
green "load protected" light
flashes for three seconds,
the inverter starts and, if transfer conditions with the Mains 2 input are correct, the load is transferred to the inverter,
red "load not protected" light
goes off,
green "load protected" light
on the control panel goes on.
Q1
Q4S
Q3BPQ5N
OFF ON
(0)
(I)
OFF
(0)
ON
(I)
OFF
(0)
2
I
+ –
!
!
O
2
Q1
Q4S
Q3BPQ5N
OFF ON
(0)
(I)
ON
(I)
ON
(I)
OFF
(0)
Q1
Q4S
Q3BPQ5N
OFF ON
(0)
(I)
ON
(I)
ON
(I)
ON
(I)
QF1
OFF ON
(0)
(I)
Q1
Q4S
Q3BPQ5N
ON OFF
(I)
(0)
ON
(I)
ON
(I)
ON
(I)
6
I
+ –
!
!
O
6
5
2
5