Installing C2RPS-CHAS2 into the Rack
2-4 Installation
To install a PSM, proceed as follows:
1.
Align the PSM with the slot, then slide the PSM forward until its front panel is flush 
against the chassis front panel. 
2.
Fasten the PSM to the chassis using the captive screws.
3.
Perform steps 1 and 2 for each PSM being replaced. When completed, proceed to 
Installing C2RPS-CHAS2 into the Rack
To install the chassis into a 19‐inch (48.3‐cm) rack, you need four user‐supplied screws to 
fasten the chassis to the rack rails.
After installing the PSM(s) as described back in “
rack mount the chassis as follows:
1.
Refer to the installation guidelines (“
2.
Install the chassis into the rack (“
3.
Connect the PSM cables and AC power cords (“
Guidelines for Rackmount Installation
The installation site must be within reach of the network cabling and meet the 
requirements listed below:
Chassis placement close enough to connect the 2‐meter (6.6‐foot) AC power cords 
from the PSMs to the AC power source.
Up to two three‐pronged power receptacles capable of delivering the current and 
voltage specified in 
” on page A‐2. Up to two AC outlets 
on independently‐fused circuits must be within 182 centimeters (6 feet) from the 
installation site. If there is an AC power source failure, this will prevent the powering 
down of PSMs due to a single source power failure.
Power cords and type of outlet are dependent on the country. In the United States, 
one power cord with an NEMA 5‐15P plug is provided with each C2RPS‐PSM.
An ambient temperature of between 5°C (41°F) and 40°C (104°F) must be maintained 
at the installation site with fluctuations of less than 10°C (18°F) per hour.
Note: If you plan to remove and not replace a C2RPS-PSM, immediately reinstall 