Eaton Electrical 9130 User Manual

Page of 120
INSTALLATION
Eaton
®
 9130 UPS (700–3000 VA) User's Guide  
S
  164201718 Rev 2
 www.powerware.com
21
2.
Select the proper holes in the rack for positioning the UPS in the
rack (see Figure 5). The rails occupy four positions on the front and
rear of the rack.
3.
Secure one rail assembly to the front of the rack with one
M6
 
16 pan-head screw and one M6 cage nut.
4.
Using two M6 cage nuts and two M6
 
16 pan-head screws, attach
the rail assembly to the rear of the rack.
M6
 
16 Pan-Head
Screws (6 places)
Front of Rack
M6 Cage Nuts
(6 places)
Tighten
adjustment
screws after rail attachment
(3 places each rail).
Position 4
Position 1
Figure 5. Securing the Rails
5.
6.
Tighten the three adjustment screws in the middle of each rail
assembly.
7.
8.
Place the UPS on a flat, stable surface with the front of the cabinet
facing you.
9.
Align the mounting brackets with the screw holes on each side of
the UPS and secure with the supplied M4
 
8 flat-head screws (see