Clover Electronics LCD2088 User Manual

Page of 176
 
 
15
 
 
 
3.   What to do at the time of Installation
 
 
 
The system should be installed in the following order;   
1.  Make sure all the required hardware is available. 
- 20.1” wide TFT-LCD monitor built-in 8 Ch DVR 
- Up to 8 cameras capacity (Refer to the retail box for the number of camera included 
in the system).   
- CCTV monitor or TV set if necessary   
- Network cable if connecting to a PC 
2.  Connect the cameras to the monitor (Refer to [Fig. 5-3]). 
4.  Confirm if live video is displayed on the monitor before going to the next step.   
5.  Select the Setup Menu and set current date and time (Refer to Section 7-2.3).
 
 
6.  Run the FACTORY DEFAULT setting in the SYSTEM menu. 
7. Perform HDD formatting.  
8.  Escape from Setup Menu.   
9.  Set values for required options.   
10. 
Network cable should be connected to the monitor before turning the power on. 
 
Refer to [Fig. 5-8] for the cable specification.