Emerson Process Management CFA-3000 User Manual

Page of 74
To mount main cabinet, proceed as follows (see Figure 2­2): 
1.   Securely attach supplied "L" brackets to wall using suitable hardware. Brackets must be anchored properly
to support 250 pounds (113.6 kg).
2.   Attach main cabinet to "L" brackets using supplied four bolts, split ring washers, and hex nuts.
2.3    Mount Reagent Cabinet 
To mount reagent cabinet, proceed as follows:
1.   Loosen the four bolts in bottom of main  cabinet.
2.   Lift reagent cabinet and attach to main cabinet by placing heads of bolts into keyhole slots in top of   
reagent cabinet. 
3.   Slide reagent cabinet back.
4.   Feed grounding strap on bottom of main cabinet through notched hole in left rear corner and attach it to 
stud on back of reagent cabinet (see Figure 2­3).
5.   Tighten screws to attach reagent cabinet to main cabinet.
6.   For multi­stream units, plug valve bank cable into positive fit receptacle at left side of cabinet (refer to 
Figure 7­1, “Multi­stream Valve Panel Connector”).
6
CFA­3000 ISE Analyzer
Instruction Manual
2.2    Mount Main Cabinet 
General Recommendations
 This cabinet is not for outdoor installation.
 Environmental conditions of enclosed facility:
•  Temperature: 
min. 50°F to max. 113°F 
(min 10°C – max. 45°C) 
±10° within regulated range.
•  Humidity: non­condensing
 Mount cabinet on a wall or other suitable vertical surface, at least 42” (107 cm) wide and    
43­1/2” (111 cm) off the floor.
 Mounting surface must be able to support 250 pounds (113.6 kg).
 Allow 1­1/2 feet (.5 m) of clearance at left side of analyzer for access to input/output panel,   
and allow for swing out for rear access.
 Allow 12” (.3 m) at right side for access to overflow tube assembly (if single stream).
Mount cabinet level, or with a slight backward tilt for proper leak detector operation.