User ManualTable of ContentsSAFE INSTALLATION, USE AND SERVICE2Filling the Water Heater18APPROVALS2Vent Pipe Assembly19GENERAL SAFETY INFORMATION3Venting19TABLE OF CONTENTS5Vent Pipe Termination20INTRODUCTION5Planning the Vent System21Qualified Installer or Service Agency5Condensate21Preparing for the Installation5Blower Assembly Installation22Installation of Vent System22OF MASSACHUSETTS6Vent Terminal Installation, Sidewall22TYPICAL INSTALLATION7Installation of Vent System, Sidewall24ROUGH IN DIMENSIONS10Installation of Vertical Vent System24LOCATING THE NEW WATER HEATER11Vent Attenuation Assembly Installation Instructions25Facts to Consider About Location11Vent Pipe Preparation27Insulation Blankets12LIGHTING & OPERATING LABEL29Air Requirements12TEMPERATURE REGULATION30Unconfined Space13FOR YOUR INFORMATION31Confined Space13Start Up Conditions31Fresh Air Openings for Confined Spaces13Outdoor Air Through One and Two Openings13Operational Conditions31Outdoor Air Through Horizontal and Vertical Ducts14PERIODIC MAINTENANCE32Air from Other Indoor Spaces14Venting System Inspection32INSTALLING THE NEW WATER HEATER15Burner Operation and Inspection32Chemical Vapor Corrosion15Burner Cleaning32Water Piping15Housekeeping32Space Heating and Potable Water System15Anode Rod Inspection32Closed Water Systems15Temperature-Pressure Relief Valve Test33Thermal Expansion16Draining and Flushing33Temperature-Pressure Relief Valve16Service34High Altitude Installation17LEAKAGE CHECKPOINTS34Gas Piping17TROUBLESHOOTING GUIDELINES35Sediment Traps18LIMITED WARRANTY39Size: 3.93 MBPages: 40Language: EnglishOpen manual