User ManualTable of ContentsTitle1Contents21. Safety Precautions42. System Requirements52.1 Requirements (system recommendations)52.2 Compatible Units52.3 Restrictions62.4 Other Devices73. System Configuration83.1 System Configuration Example83.2 Hardware Connection Diagram84. Flow of Site Adjustment94.1 Flow of Site Adjustment94.2 Tools for Site Adjustment94.3 Step 1: Test operation from centralized controller G-50A104.4 Step 2: Initial setting of integrated centralized control software TG-2000A104.5 Step 3: Test operation from integrated centralized control software TG-2000A115. Installation125.1 Pre-installation Steps125.2 TG-2000A Setup125.2.1 Setup125.2.2 Running TG-2000A Setup (New setup)135.3 TG-2000A Uninstall156. Part Names and Functions166.1 Window Elements166.2 Basic Mouse Operation176.3 Accessing Functions and Moving between Windows177. Initial Startup and Shutdown237.1 Before Startup237.2 Startup237.3 Shutdown248. System Setting Procedure258.1 System Setting Screen258.2 System Setting Procedure258.3 User Set-up268.3.1 General Operation268.3.2 Connection Setting278.3.3 Reliability Function278.3.4 Energy Monitoring Related288.4 Site Name Set-up288.5 G-50 Connection Set-up308.5.1 Setting Procedure and Restrictions308.5.2 Number of G-50A set-up (Step 1)308.5.3 IP address of G-50A set-up (Step 2)308.6 System Configuration Set-up318.6.1 Setting Procedure and Restrictions318.6.2 G-50A data collection (Step 1)328.6.3 Unit composition set-up (Step 2)328.6.4 Set-up of refrigerant system (Step 3)348.6.5 Set-up of group (Step 4)358.6.6 Interlocked setting (Step 5)368.7 Monitoring Screen Set-up378.7.1 Configuration Procedure and Restrictions378.7.2 Set-up of model name (Step 1)378.7.3 Set-up of the number of floors, and floor name (Step 2)388.7.4 Creation of a plane view (Step 3)398.7.5 Set-up of floor name and G-50 (Step 4)398.7.6 Set-up of icon arrange and name (Step 5)408.7.7 Set-up of block (Step 6)418.8 Watt Hour Meter Set-Up438.8.1 Setting Procedures and Restrictions438.8.2 Watt Hour Meter Setting (Step 1)438.8.3 Set-up for the Name and the Maximum Integrated Value of WHM (Step 2)448.9 Energy Monitoring Set-up458.9.1 Setting Procedures and Restrictions458.9.2 Division mode (Step 1)468.9.3 Relation between outdoor units and watt hour meters (Step 2)468.9.4 Electrical specification of outdoor units (Step 3)478.9.5 Relation between indoor units and watt hour meters (Step 4)488.9.6 Electrical specification of indoor units (Step 5)498.9.7 Charge Blocks (Step 6)498.9.8 Currency unit set (Step 7)518.9.9 Charge set (Step 8)518.9.10Standard charge set (Step 9)528.10 Time Set-up538.11 Password Set-up559. Charge Data Correction and Remedy569.1 Result of Air-conditioning Charge Calculation569.2 Maintenance of Charge Data589.2.1 Preparing for Charging Data Maintenance589.2.2 Maintenance Methods and Restrictions589.2.3 Unit Data Maintenance599.2.4 Watt Hour Meter Data Maintenance629.2.5 Verify Test Operation of Watt Hour Meter639.3 Operation Amount Data Monitoring639.4 Charge Parameter Output649.5 Charging Remedy659.5.1Preparing to perform remedy669.5.2Remedial apportioning setting screen679.5.3Remedy when personal computer HDD fails (no backup)699.5.4 Remedy when personal computer HDD fails (backup)709.5.5 Apportioning method when computer crashes729.5.6 Remedy when watt hour meter fails (monitoring impossible)739.5.7 Remedy for system information setting error7510. Error Code List7711.Setting Check List8111.1 Setting Check List8111.2 Test Run Check8211.3 Charging Test Run Check8511.3.1 Charging (No WHM connection) Test Run Check8511.3.2 Proportionally Divided Power Charge (RS-485 WHM connection) Test Run Check89Appendix 1: Installing Windows XP Professional94Appendix 2: Auto Log-in Confirmation Method96Appendix 3: Correction to Charge Calculation in the Event of G-50A Replacement due to Fault97Size: 3.91 MBPages: 98Language: EnglishOpen manual