User ManualTable of ContentsFurnace Specifications4Furnace Airflow Data6Installation Requirements8Supply Air Plenum Installation9Installation on a Concrete Slab9Installation on a Combustible Floor9Circulating Air Supply10Return Air11Venting and Combustion Air Requirements11Air Requirements for One-Pipe Installation13Installation in An Unconfined Space13Installation in A Confined Space13• Air From Inside13• Air Directly Through An Exterior Wall14• Outdoor Air Through Vertical Openings or Ducts14• Outdoor Air Through Horizontal Openings or Ducts14Venting Requirements14Vent Pipe Material14Vent Pipe Length and Diameter14Vent Pipe Installation15Pipe Routing & Support15Location of Outdoor Terminations18Horizontal Venting19Vertical Venting20Vent Freezing Protection20Concentric Vent Termination20Drainage of Condensate From Furnace21Gas Supply and Piping22Leak Check22Conversion23High Altitude Application23Natural Gas High Altitude Conversion23LP/Propane Gas Sea Level and High Altitude Conversion23Electrical Wiring24Line Voltage Wiring24Low Voltage Wiring25Start-up and Adjustments25Start-Up Procedure26Verifying and Adjusting Firing Rate26Verifying and Adjusting Temperature Rise27Verifying Burner Operation27Verifying Operation of the Supply Air Limit Switch29Description of Components29Maintenance31Combustion Air and Vent System31Air Filter(s)31Lubrication31Condensate Drain Assembly31Blower Compartment31Heat Exchanger and Burner Maintenance31Location of Major Components32System Operation Information31Sequence of Operation33Furnace Fails to Operate34Twinning of Two Furnaces34Installation/Performance Checklist35furnace?35Size: 682 KBPages: 36Language: EnglishOpen manual