51D0528
LX Series Direct Vent Gas Fireplace
VeNtING INStALLAtIoN
side. This prevents loose insulation from falling into the 
required clearance space. Figure 30. Otherwise, install 
firestop below the framed hole. The firestop should be 
installed with no less than three nails per side. Figure 
35. 
FP1969
firestop w room above
Figure 30 - 
If area above is a room, install firestop above framed 
hole as shown 
Firestop 
Nails
FP1969
9
1
/
2
"
9
1
/
2
"
FP1970
firestop no room
Figure 31 - 
If area above is not a room, install firestop below 
framed hole as shown 
Nails
Firestop 
FP1970
2.  Assemble the desired lengths of pipe and elbows nec-
essary to reach from the burner system flue up through 
the firestop. Be sure pipe and elbow connections are 
fully twist-locked. Page 17, Figure 16 
3.  Cut a hole in the roof using the locating hole as a center 
point. (Cover any exposed open vent pipes before cut-
ting hole in roof). The 9Z\x" x 9Z\x" (241 x 241 mm) hole 
must be measured on the horizontal. Actual length may 
be larger depending on the pitch of the roof. There must 
be a 1" minimum clearance from the vent pipe to com-
bustible materials. (Insulation should be considered a 
combustible material) Frame the opening as shown on 
Page 17, Figure 15.
4.  Connect a section of pipe and extend up through the 
hole.
Note: If an offset is needed to avoid obstructions, you 
must support the vent pipe every three (3) feet. Use wall 
straps for this purpose. Refer to Figures 27 & 29. Whenever 
possible, use 45° elbows instead  of 90° elbows. The 45° 
elbow offers less restriction to the flow of the flue gases 
and intake air.
5.  Place the flashing over the pipe section(s) extending 
through  the  roof.  Secure  the  base  of  the  flashing  to 
the roof and framing with roofing nails. Be sure roofing 
material overlaps the top edge of the flashing. There 
must be a 1" clearance from the vent pipe to combustible 
materials.  
6.  Continue to add pipe sections until the height of the vent 
cap meets the minimum requirements below.
Note:  You  must  increase  vent  height  for  steep  roof 
pitches. Nearby trees, adjoining roof lines, steep pitched 
roofs, and other similar factors may cause poor draft or 
down-drafting  in  high  winds.  Increasing  the  vent  height 
may solve this problem.
Note: If the vent pipe passes through any occupied areas 
above the first floor, including storage spaces and closets, 
you must enclose pipe. You may frame and sheetrock the 
enclosure with standard construction material. Make sure 
to meet the minimum allowable clearances to combustibles. 
Do  not  fill  any  of  the  required  clearance  spaces  with 
insulation.  
2 ft. 
Min.
2 ft. Min.
X
12
H*
FP1971
Min chimney clearance
Termination 
Vent
Storm 
Collar
Flashing
Lowest 
Discharge 
Opening
Concentric 
Vent Pipe
1” Minimum Clearance to 
Combustibles
FP1971
Horizontal Overhang
Figure 32 - 
Minimum Chimney 
Clearance
 
Roof pitch 
h (feet)
 
Flat to 6/12 
1.0
  Over 6/12 to 7/12 
1.25
  Over 7/12 to 8/12 
1.5
  Over 8/12 to 9/12 
2.0
  Over 9/12 to 10/12 
2.5
  Over 10/12 to 11/12 
3.25
  Over 11/12 to 12/12 
4.0
*H - Minimum height from roof to 
lowest discharge opening of vent