Enviro EG40-070 Manual De Usuario

Descargar
Página de 36
22
V
ERTICAL
 I
NSTALLATION
:
1.  Check the instructions for required clearances (air spaces) to combustibles when passing through 
ceilings, walls, roofs, enclosures, attic rafters, or other nearby combustible surfaces. Do not pack air 
spaces with insulation.
Figure 29: Wall Framing for 10” (25.4 cm) x 10” (25.4 
cm) Hole for Vertical Installation. 
2.  Set  the  gas  appliance  in  the  desired  location. 
Drop a plumb bob down from the ceiling to the 
position  of  the  appliance  flue  exit,  and  mark 
the  location  where  the  vent  will  penetrate  the 
ceiling. Drill a small hole at this point. Next, drop 
a plumb bob from the roof to the hole previously 
drilled in the ceiling, mark the spot where the 
vent will penetrate the roof. Determine if ceiling 
joists, roof rafters, or other framing will obstruct 
the  venting  system.  You  may  wish  to  relocate 
the appliance, or to offset, to avoid cutting load 
bearing members.
3.  To install the Round Support Box/Wall Thimble 
in a flat ceiling, cut a 10 inch (25.4 cm) square 
hole in the ceiling, centered in the hole drilled in 
Step 2. Frame the hole as shown in Figure 29.
4.  Assemble the desired lengths of black pipe and 
elbows  necessary  to  reach  from  the  appliance 
Vertical
Termination
Storm Collar
Flashing
Roofing nails
Elbow Strap
the  roof  line.  Galvanized  pipe 
and  elbows  may  be  utilized  in 
the  attic,  as  well  as  above  the 
roof  line.  The  galvanized  finish 
is desirable above the roof line, 
due  to  the  higher  corrosion 
resistance.
6.  Once  the  pipe  sections  have 
been joined, and run up through 
the  hole  in  the  roof,  slip  an 
elbow  strap  over  the  exposed 
sections,  bend  the  support 
straps  outwards,  and  push  the 
elbow  strap  down  to  the  roof 
level,  as  shown  in  Figure  30. 
Tighten  the  clamp  around  the 
pipe section. Use a level to make 
sure  the  pipe  is  truly  vertical. 
With  roofing  nails,  secure  the 
adapter up through the Round Support Box. Insure that all pipe and elbow connections are in their 
fully twist-locked position.
5.  Cut hole in the roof centered on the small hole placed in the roof from Step 2. The hole should be of 
sufficient size to meet minimum requirements for Clearance to Combustibles, as specified. Continue 
to assemble lengths of pipe and elbows necessary to reach from the ceiling support box up through 
Figure 30: Vertical Vent Termination Installation.
Initial Installation
QUALIFIED INSTALLERS ONLY