Bacharach AGM300 Manual De Usuario

Descargar
Página de 94
2
 
Instruction 3015-4275 
AGM300 - Installation Considerations 
Locating the Monitor 
The AGM300 should be centrally located in the facility and should be easily accessible for visual monitoring and 
servicing. Intake sample lines can be up to 500 feet in length, but it is important to remember that sampling 
cycle time is proportional to the total number and length of individual sample lines. 
Dirt, grease, and oils can adversely affect the operation of the AGM300. The monitor should be installed out of 
direct sunlight in a clean, dry area that is not subject to temperature or humidity extremes. Installation of the 
monitor in a mechanical room is acceptable provided reasonable environmental conditions exist. If there is a 
question, consider installing the unit outside of the mechanical room in a cleaner area of the facility. 
 
Warnings and Cautions 
WARNING – Drilling holes in the AGM300 and 
ADM800 enclosure will void the warranty
.  Please 
use knockouts provided for electrical connections. 
WARNING - Do not operate this equipment in the 
presence of flammable liquids, vapors or aerosols. 
Operation of any electrical instrument in such an 
environment constitutes a safety hazard. 
WARNING - Always de-energize the power supply 
before working inside the instrument. 
CAUTION - The AGM300 contains sensitive 
electronic components that can be easily damaged. 
Be careful not to touch or disturb any of these 
components. 
 
Inspection 
The AGM300 has been thoroughly inspected and tested prior to shipment from the factory. Nevertheless, it is 
recommended that the monitor be re-checked prior to installation. Inspect the outside of the enclosure to make 
sure there are no obvious signs of shipping damage. Open the door latches and inspect the interior of the 
instrument for loose components that may have become dislodged during shipment. If damage is discovered, 
please contact the nearest Bacharach Service Center for assistance.