Lucent Technologies Release 7 Manual De Usuario

Descargar
Página de 2657
DEFINITY Enterprise Communications Server Release 7 
Maintenance for R7r  
555-230-126  
Issue 4
June 1999
Maintenance Commands 
8-184
reset port-network 
8
Parameters
Examples
reset port-network 10 level 2
Output
For more information, see 
 at the beginning of this chapter. The following display shows a typical 
result when reset port-network 4 lev 1 is entered.
PN#
Port network number
Use list cabinet to find the PN number(s) associated with a given 
cabinet.
level 1 | 2
Reset level 1 (WARM restart) is used to restart an EPN that is still fully or 
partially in service. All stable calls are preserved, and full service is 
restored within 35 seconds.
Reset level 2 (COLD restart) results in reset, removal, and reinsertion of 
all EPN circuit packs. It is used to recover an EPN that has been taken 
out of service. Level 2 restarts should take less than 2 minutes. All calls 
and application links with an endpoint in the EPN are dropped. If two 
level 2 resets within an hour fail to return the EPN to service, EPN 
Emergency Transfer is invoked. (EPN Emergency Transfer will already 
be in effect if the link to the EPN has been down for more than 1 
minute).
Port
The PN number of the reset EPN.
 
 reset port-network 4 level 1 
 
                                  TEST RESULTS
 
 Port      Maintenance Name  Alt. Name  Test No.  Result  Error Code
 
 04        EXP-PN                       956       PASS
 
 
 
 
 Command Successfully Completed