DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Install Telecommunications Cabling 
Page 2-19
Cable Installation 
2
Figure 2-11.
Cable Routing to Bottom Terminal Blocks
Route Cables to Main Distribution Frame
The following guidelines should be followed when routing cables from the 
cabinet to the MDF.
Each port cable is connected at the cabinet and then routed along the 
front trough of the cable slack manager to the connecting/terminal block 
where the cable is to be terminated.
Enough slack must be left at the cabinet end of the cable to allow for 
proper dressing of the cables.
Figure Notes:
1. Main Distribution Frame
2. AC Power Cord (AC-Powered 
Cabinets Only)
3. Cable Slack Manager Number 1
4. Trunk/Auxiliary Field
5. Station Distribution Field
6. Cable Slack Manager Number 2
7. Cable Slack Manager Number 3
8. System Cabinet(s)
9. Building Cables (Through Cable 
Trough)
10. 10 AWG (#25) (6 mm
2
) Wire to 
Coupled Bonding Conductor
r758432b MMR 052996