Cisco Systems 6807-XL Manual De Usuario

Descargar
Página de 118
C H A P T E R  
3
Installing the Switch
Installation Tasks
The process of installing the switch can be broken down into a series of tasks described in the following table:
Table 10: Installation Tasks
Description
Task
Remove the switch from the packaging material.
We recommend that you save the packaging material for use
later if you have to move the chassis.
Note
Unpacking the switch
Install the rack-mount shelves before you install the chassis in the rack.
The shelf brackets help support the weight of the chassis.
Installing the rack-mount shelf kit
Install the chassis in a standard 19-inch rack, either open or enclosed.
Rack-mounting the chassis
Cisco Catalyst 6807-XL Switch Hardware Installation Guide    
    OL-30656-01
29