Cisco Systems 6807-XL Manual De Usuario

Descargar
Página de 118
rack-mount screws. The clip nuts or cage nuts are not included as part of the accessory kit; you must
obtain them on your own.
• Rack-mount shelf kit—This kit is used to support the weight of the chassis while you secure the chassis
L brackets to the rack enclosure. It consists of two shelf brackets and a crossbar bracket.
• Two 9-slot cable management guides—The cable guides can be installed on the front of the chassis
using the same sets of screws that secure the chassis rack-mount brackets to the rack posts.
• Power supply and module blank panels—The power supply and module blank panels must be installed
on any unused power supply bays or module slots to maintain chassis airflow and EMI shielding.
• Right-angled grounding lug and disposable ESD wrist strap and clip.
• Screws
Table 11: Types of Screws Shipped with the Accessory Kit
Quantity
Type
24
12-24 x 0.75mm
24
10-32 x 0.75mm
2
M3 x 0.5 x 8mm
2
M4 x 8mm
Related Topics
Unpacking the Switch
Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store
them with the pallet. You will require these containers if you have to move or ship the switch in the future.
For repacking instructions, see
.
Tip
To check the contents of the shipping container, perform the following:
• Check the contents of the accessory kit. Verify that you have received all the listed equipment, including
any optional equipment you may have ordered, such as, network interface cables, transceivers, or special
connectors.
• Check the modules in each slot. Ensure that the configuration matches the packing list and that all of
the specified interfaces are included.
   Cisco Catalyst 6807-XL Switch Hardware Installation Guide
32
OL-30656-01   
Installing the Switch
Unpacking the Switch