Cisco Systems 6807-XL Manual De Usuario

Descargar
Página de 118
1
Connecting the chassis to system ground.
2
Installing and connecting the power supplies to the power source.
3
Connecting the network interface cables to the supervisor engine and modules. This may involve installing
transceivers before you attach the network interface cables.
4
Powering up the chassis and verifying the installation.
Related Topics
Chassis, on page 2
Physical Specifications, on page 61
Finding Serial Numbers, on page 106
Establishing System Ground
To attach the grounding lug and cable to the grounding pad, perform these steps
Before You Begin
To connect the system ground, you require the following tools and materials:
• Grounding lug—A two-hole right-angled lug. Supports up to 6 AWG wire. Supplied as part of accessory
kit.
• Grounding screws—Two M4 x 8 mm (metric) pan-head screws. Supplied as part of the accessory kit.
• Grounding wire—Not supplied as part of accessory kit. The grounding wire should be sized according
to local and national installation requirements. Depending on the power supply and system, a 12 to 6
AWG copper conductor is required for U.S. installations. Commercially available 6-AWG wire is
recommended. The length of the grounding wire depends on the proximity of the switch to proper
grounding facilities.
• No. 1 Phillips screwdriver.
• Crimping tool to crimp the grounding wire to the grounding lug.
• Wire-stripping tool to remove the insulation from the grounding wire.
Cisco Catalyst 6807-XL Switch Hardware Installation Guide    
   OL-30656-01
41
Installing the Switch
Establishing System Ground