Cisco Systems 2130 Manual De Usuario

Descargar
Página de 116
3-20
Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide
78-18579-02
Chapter 3      Installing the Cisco ADE 2130 and 2140 Series Appliance
    Powering Up the Cisco ADE 2130 and 2140 Series Appliance
Powering Up the Cisco ADE 2130 and 2140 Series Appliance
Warning
Do not touch the power supply when the power cord is connected. For systems with a power switch, 
line voltages are present within the power supply even when the power switch is off and the power 
cord is connected. For systems without a power switch, line voltages are present within the power 
supply when the power cord is connected. 
Statement 4
Warning
This equipment is intended to be grounded. Ensure that the host is connected to earth ground during 
normal use. 
Statement 39
This section explains how to power up the appliance. Depending on whether your appliance has AC or 
DC power supplies, see the appropriate section:
Warning
Never install an AC power module and a DC power module in the same chassis. Statement 1050
Power-Up Procedure (AC Power Supply)
To power up a Cisco ADE 2130 and 2140 Series appliance with an AC power supply and verify its 
initialization and self-test, follow this procedure. When the procedure is finished, the appliance is ready 
to configure.
Step 1
Review the information in the 
Step 2
Before proceeding, if the AC power cord is connected directly into the AC power outlet and because the 
AC power cord provides its own ground conductor, you only need to ensure that the rack has been 
properly grounded. (See the 
information.)
Step 3
Plug the AC power cord into the power cord receptacle at the rear of the appliance. (See location 1 in 
.)
Step 4
Connect the other end of the power cord to a power source at your installation site.
Step 5
If there is a second AC power supply, repeat Steps 
 an
 for the second power supply.
Step 6
Press the power button on the front of the appliance. (See location 9 in 
The appliance should begin its powerup procedure. 
Step 7
After the operating system boots up, observe the front-panel LEDs to verify that your system is operating 
properly. (See 
.)
Once the operating system boots, you are ready to initialize the basic software configuration. (See the 
software installation guide or user guide that shipped with your appliance for proper configuration 
procedures.)