Crestron electronic CP2 Manual De Usuario

Descargar
Página de 40
2-Series Integrated Control Processor 
 
Crestron CP2/CP2E
 
 
Controls and Indicators 
The CP2/CP2E front panel indicators and controls are described below.  
PWR (Power) 
This LED illuminates when the unit is connected to and receives 24VDC power from 
an AC power pack or the Cresnet NET connector.  
NET 
This LED illuminates when the central processing unit is processing or 
communicating with Cresnet devices (i.e., button pressed at Cresnet panel or data 
received from Cresnet panel).  
ERR 
This LED illuminates when an error condition is detected. This may be the result of 
hardware or software failure, or a programming error. To determine the actual error 
condition, examine the message available through the Viewport menu Functions/2-
Series/errorlog.
 
LNK (LAN) – (CP2E only) 
This LED illuminates when there is a connection to the rear panel LAN port.  
ACT (LAN) – (CP2E only) 
This LED illuminates when there is communication (activity) at the rear panel LAN 
port.  
HWR 
Pressing this button initiates system hardware reset. (Same effect as disconnecting 
and reconnecting power.)  
SWR 
Pressing this button in combination with the HWR button performs a system restart 
without loading the program (refer to Troubleshooting Communications on page 22). 
Pressing it alone while the system is running restarts the program.  
Ports 
The CP2/CP2E rear panel ports are illustrated and described below. 
COMPUTER 
 
COMPUTER
 
This DB9F connector is used when programming the units with a PC. The port is 
modem compatible. The modem and/or PC program cable are not included.  
NET 
G   Z   Y  24
24VDC 24W
NET
 
4  
  2-Series Integrated Control Processor: CP2/CP2E 
Operations Guide - DOC. 5980