Siemens V1.0 Manual De Usuario

Descargar
Página de 25
 
- 9 - 
 
f)  Check that the Run/Stop column has green indicators.  If not, select the Diagnostics tab 
to determine the error. 
 
4.3  Configure the PROFINET IO Network 
 
a)  Execute SIMATIC NCM PC Manager (or STEP7 SIMATIC Manager).  
Create a new project with File->New.  
Select “Insert->Station->SIMATIC PC Station”. 
Change the name to match the PC station name in the Station Configuration Editor (e.g., 
PCStation) as shown below. 
 
 
Configuration OK