Cisco Systems 566 Manual De Usuario

Descargar
Página de 110
 
Chapter 3      Installing the Content Engine
    Installing a CE-511 or CE-566 Unit
3-4
Cisco Content Engine 511 and 566 Hardware Installation Guide
OL-5756-01
To install a Content Engine in a 2-post rack, follow these steps:
Step 1
Attach a bracket to one side of the chassis, aligning the front flange of the bracket 
with the hash mark on the side of the chassis. (See 
Figure 3-2
Installing the Chassis in the Rack
Step 2
Attach a second bracket to the opposite side of the chassis in the same manner. 
Step 3
After you secure the brackets to the chassis, rack-mount the chassis by securing 
the brackets to two posts or mounting strips in the rack. You need two people to 
install the chassis in the rack—one person to hold the chassis and one person to 
secure it to the rack.
The inlet and exhaust ports for cooling air are located in the front and rear of the 
chassis, respectively; therefore, multiple Content Engines can be stacked with 
little or no vertical clearance.
Installing the Chassis in a 4-Post Rack
 shows the items that you need to install the Content Engine in a 4-post 
rack. If any items are missing or damaged, contact your place of purchase.
124555
Front
Rear