AEG 1.04 Manual De Usuario

Descargar
Página de 56
 
 
28 
b.  Connection with three-phase input 
 
 
Note:
 If using three-phase mains connection, make sure 
the phase sequence is correct. The UPS cannot start up if 
the phase sequence is wrong, and an alarm will sound. At 
the same time, "Phase sequence error" appears on the LC 
display. Make sure the neutral conductor is connected 
correctly as well. 
5. Installation clearances 
A gap of at least 80 cm is required in front of the 
PROTECT 1.M and at least 30 cm behind the UPS for 
maintenance purposes. No objects should be placed 
closer than 30 cm to the side of the UPS. 
Mo
re
 t
ha
re
 3
0c
m
Mo
r e
 t
ha
r e
 8
0c
m
> 80cm
> 30cm