APC PSXBR6KI Manual De Usuario
990-7208A
1 of 5
®
PowerStruXure™ Type A
Site Preparation Guide
220–240V, 2–6kVA Systems
Site Preparation Guide
220–240V, 2–6kVA Systems
Selecting and
purchasing system
components
purchasing system
components
When ordering your system:
• Determine your load power and runtime requirements.
• Purchase your system components.
– Include Symmetra
®
redundant battery and power modules
required for your system.
– Select options and accessories, such as management cards and
rack-mount PDUs.
• Evaluate and select a service plan.
For assistance with these tasks, go to the APC Web page
www.apc.com/products/powerstruxure/index.cfm/.
www.apc.com/products/powerstruxure/index.cfm/.
Environmental
requirements
requirements
Select a site that is temperature-controlled, clean, dry, and free of
conductive contaminants, and that meets the following specifications:
conductive contaminants, and that meets the following specifications:
Allow for the following typical thermal dissipation by the UPS when it
is fully loaded and has N+1 redundancy (one more power module than
necessary to support the load).
is fully loaded and has N+1 redundancy (one more power module than
necessary to support the load).
.
Required clearances for
access and ventilation
access and ventilation
All enclosures require the same clearances, which are the clearances
required for NetShelter
required for NetShelter
®
VX enclosures.
Temperature
0– 40° C (32° –104° F)
Relative Humidity
0– 95% non-condensing
Elevation above mean sea level
0– 3000 m (0 – 10 000 ft)
UPS 6 kVA N+1(Full Load) with batteries charged
1290 BTU
UPS 6 kVA N+1(Full Load) with batteries charging
3300 BTU