GSS Series User Manual 
2. Installation 
2.1. Starting the GSS Series Switches 
This section provides a quick start guide for:
   
 
•  Hardware and Cable Installation 
•  Management Station Installation 
•  Software booting and configuration  
 
2.1.1. Hardware and Cable Installation 
Please Note: 
⇒ Wear a grounding strap to avoid damaging the switch with electrostatic discharge 
⇒ Be sure that the power switch is in the ‘OFF’ position before you insert the power cord 
 
• 
Installing Optional SFP Mini-GBIC Modules
 
 
SFP port
Fig.
 
2.1: Installation of optional  
 SFP mini-GBIC 
Mini-GBIC module 
 
 
• 
Connecting the SFP Mini-GBIC Module to the Chassis: 
The optional SFP Mini-GBIC modules are hot-swappable, so you can plug or unplug them 
while the power is applied to the switch. 
1.  Verify that the mini-GBIC module is compatible with the SFP port on the switch (for    
example, some switch manufacturers design their mini-GBIC modules to be operable only 
in their branded devices). 
2.  Verify that the type of mini-GBIC you have selected for use will be compatible with the  type 
of fibre optic cable that is to be used. 
3.  Verify that the type of mini-GBIC you have selected for use will be compatible  with the 
 
fibre optic transceiver at the other end of the link (e.g. – compatible wavelength and 
 standard) 
4.  Slide the module along the slot and ensure that the module is properly seated against the 
 
SFP slot socket/connector. 
5.  Install the media cable for network connection 
6.  Repeat the above steps, as needed, for each module to be installed into the switch                                      