Grindmaster 115A Manual De Usuario

Descargar
Página de 24
Cleaning Instructions
The outside of the machine can be cleaned with a damp cloth or common household polishing wax. Grinding parts should
be cleaned with a stiff brush or dry cloth. Do Not Use Water. See “Shear Disc Replacement” for instructions on assembling
and disassembling of grinder parts. Before reassembling, wipe motor shaft with 2 or 3 drops of common household lubricat-
ing oil in the area of feedworm engagement to make assembly easier.
For Models 250RH-2, 250RH-3:
Regular usage of the coffee hoppers will cause oils to accumulate on the inner surface, requiring occasional cleaning.
1.
Remove hopper from grinder and empty all beans.
2.
Use a soft, damp cloth with a small amount of liquid soap and clean hopper. Use a clean, damp cloth to remove the 
soap residue. Do not immerse or fill hopper with water.
3. 
Allow hopper to completely air dry before refilling with beans.
4.
Once the hopper is dry, refill with whole bean coffee, cover and replace on grinder.
Shipping Bracket Removal
NOTE: Shipping bracket must be removed prior to removal of 
upper hopper assembly.
Models 250, 250A and 250AB are equipped with shipping bracket. 
Remove bracket prior to installation. (see Figure E) 
Tools Required: 1 Phillips screwdriver.
1.
Using the Phillips screwdriver, remove the screws and the bracket 
located at the back of the grinder.
2.
Do not discard the screws and bracket. The bracket should be re-installed 
on the grinder prior to transporting or shipping.
Removal and Reinstallation of Hopper Assembly
For Models 250, 250A, 250AB, 250-3A:
1.
Remove Upper Front Plate by removing the four screws in the corners
(Shipping bracket must be removed prior to removal of upper
hopper assembly. See instructions and diagram above.)
2.
Lift Upper Hopper Assembly while rotating the Assembly slightly
upward (see Figure F).
3.
Pull the Assembly forward, toward front of unit and out.
4.
To reinstall hopper, ensure the Drive Pins are in vertical position. 
(see Figure G)
5.
Ensure that Drive Links are in horizontal position.
6.
Insert the rear slots of the Upper Hopper Assembly into the rear tabs 
of the motor bracket.
7.
Rotate assembly downward.
8.
Reassemble Upper Front Plate.
9.
Put the (4) screws back into Upper Front Plate and tighten.
For Models 250RH-2, 250RH-3:
1.
To remove hoppers, grasp hopper by handle and lift up 
approximately 1/4” and pull hopper back and out of 
grinder. The bottom bean shut off valve will close 
automatically, preventing spillage of beans.
2.
Once hopper is removed, it can be refilled or cleaned if necessary.
3.
To reinstall hopper, grab by handle and set bottom back of hopper on 
left or right side of grinder, making sure that the drive link is properly 
oriented (see Figure G).
4. 
Push hopper all the way back until it settles in it’s designated space (see Figure A).
NOTE: Hopper must be in place in order for that side of the grinder to operate.
115 & 250 Series Coffee Grinders
Page 6
Figure F: Upper Hopper Assembly 
Removal and Reinstallation
Figure E: Shipping Bracket Removal
Figure G: Positioning of the 
Drive Pins and Drive Links
Model 250
shipping bracket
The bracket may be
left on grinder, but
must be removed 
prior to servicing.