Bakers Pride DNF Manual De Usuario

Descargar
Página de 24
Doughnut Fryer 
 
Installation 
 
 
Installation 
 
 
Serious injury, equipment damage or death could result if attempting to install 
this fryer yourself. Ensure that an authorized BKI service agent installs the fryer.  
Unpacking and Handling 
It is the owners’ responsibility to file all freight claims with the delivering truck line. Inspect all cartons and 
crates for damage as soon as they arrive. If damage to cartons or crates is found, or if a shortage is 
found, note this on the bill of lading (all copies) prior to signing. 
 
If damage is found when the equipment is opened, immediately call the delivering truck line and follow up 
the call with a written report indicating concealed damage to your shipment. Ask for an immediate 
inspection of your concealed damage item. Packaging material MUST be retained to show the inspector 
from the truck line. 
Assembly and Mounting 
1.  Remove all packing from the interior and exterior of the fryer. 
 
2.  Move the fryer to its permanent location and lock the casters so the fryer does not move. Every 
time you use the fryer, ensure that the casters are locked. 
 
3.  Clean the fryer vat before filling with shortening. 
 
4.  Place the DRAIN handle in the CLOSED position. 
 
5.  If you plan to cook cake doughnuts, attach the submersion screen (R0019) to the calrod shield 
(DNFA007). 
Wiring 
 
Electrocution, equipment failure or property damage could result if an unlicensed 
electrician performs the electrical installation. Ensure that a licensed electrician 
perform the electrical installation in accordance with local codes, or in the 
absence of local codes, with the National Electrical Code, ANSI NFPA 70-20XX. 
 
This unit, when installed by an authorized BKI service agent, must be wired for use in accordance with all 
applicable local, state, and federal codes. For specific electrical requirements and connections refer to the 
wiring diagram attached to the unit or provided in the Service Manual.