Perlick 63134-1 Manual De Usuario

Descargar
Página de 8
2
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
Installation – 
Beer Pump Panels 
Use panel as a template to mark where holes
should be drilled on cooler wall. 
(Note: Make sure panel is level and pumps are
in the vertical position).
Drill 
9
/
64
” pilot holes in cooler wall. Use fasteners 
provided in installation kit to mount the beer 
pump panel to the cooler wall.
Push CO
2
supply line over Keg Pressure 
Supply barbed inlet. 
(See diagram on page 3).
Position clamp over joint and tighten. 
(Note: A
safety Relief Valve should be installed between 
supply tank and shut-off point on carbon dioxide
supply line. Relief setting depends on maximum
system pressures).
Push air or CO
2
supply line over Beer Pump 
Pressure barbed inlet. 
(See diagram on page 
3).
Position clamp over joint and tighten. If 
using compressed air, make sure air supply 
is clean and dry. Air must have a pressure 
dew point of 30°F. or lower to ensure pumps 
operate properly.
CAUTION: IF USING CO
AS A
PRESSURE SUPPLY FOR PUMPS, 
PUMP EXHAUST MUST BE VENTED 
TO A WELL VENTILATED AREA TO 
AVOID POSSIBLE ASPHYXIATION.
Push beer line (from trunk housing) over barbed 
Liquid outlet on flow reversal valve. 
(see diagram on page 3)
. Position clamp over 
joint and tighten.
Push connector hose over Liquid inlet on beer
pump inlet fitting. 
(See diagram on page 3)
.
Position clamp over joint and tighten. (Note:
Connector hose should not exceed 10 feet in
length)
.
Install washer into hex nut on opposite end of
connector hose. Connect to top threaded fitting
of Perlick Smart Coupler.
Cut a piece of CO
2
tubing and push one end
onto barbed CO
2
outlet. 
(See diagram on
page3)
. Position clamp over joint and tighten.
Push the other end over the barbed gas inlet on
the Perlick Smart Coupler. Position clamp over
joint and tighten.