Lead/Lag Control 
Lead/Lag is a control system process that automatically starts and stops a lag or second 
chiller in a 2-chiller water system. Refer to 
 for menu, table, and screen 
selection information. On machines that have PSIO software with Lead/Lag capability, it is 
possible to utilize the PIC controls to perform the lead/lag function on 2 machines. A third 
machine can be added to the lead/lag system as a standby chiller to start up in case the lead or 
lag chiller in the system has shut down during an alarm condition and additional cooling is 
required.
Note: Lead/lag configuration is viewed and edited under Lead/Lag in the Equipment Configura-
tion table (located in the Service menu). Lead/lag status during machine operation is 
viewed in the MAINT04 table in the Control Algorithm Status table. See 
Lead/Lag System Requirements:
all machines must have PSIO software capable of performing the lead/lag function
water pumps MUST be energized from the PIC controls 
water flows should be constant 
CCN Time Schedules for all machines must be identical 
Operation Features:
2 chiller lead/lag
addition of a third chiller for backup
manual rotation of lead chiller
load balancing if configured
staggered restart of the chillers after a power failure
chillers may be piped in parallel or in series chilled water flow