GTO R4854 01 Manual De Usuario

Descargar
Página de 40
8
  GTO 4000XLS Instruction Manual © 01.10.12
Step 5 
Position the operator rear mount between post pivot bracket. 
Place a 
1
/
2
” bushing above the rear mount and a 
3
/
16
”  bushing 
under the rear mount. Align the hole in rear mount, bushings 
and post pivot bracket and secure with the 3 
1
/
2
” clevis pin 
and hair pin clip.
Step 6 
Place a 
3
/
16
” bushing under the front mount and attach the 
gate bracket to the front mount using the 1 
3
/
4
” clevis pin and 
hairpin clip.
Check Clearance
Step 7 
Open the gate to the desired open position. Position the 
operator so that the gate bracket rests against the gate along 
the level scribed line. Check the clearance between the 
operator and the gate. The operator should only make contact 
with the gate at the gate bracket. There should be a minimum 
clearance of 2” between the widest part of the operator arm 
and the gate. 
When you have achieved the best position for the post pivot 
bracket in the open position, insert the 
3
/
8
” x 3 
3
/
4
” bolt and 
3
/
8
” flat washer through the aligned holes of the post bracket
and post pivot bracket to hold it in place.
Clamp the gate bracket to the gate using c-clamps or another 
type of clamp.
IMPORTANT: While determining the position of the post 
pivot bracket, be sure that the position allows for minimum 
2“ of clearance between the gate and the operator in both 
the open and closed positions. This clearance will give the 
operator the most efficient leverage point for opening and 
closing the gate and, more importantly, provides the least 
possible pinch area.
Operator
3/8” x 3-1/2” Clevis Pin
3/8” x 1/2” Delrin Bushing
3/8” x 3/16” Delrin Bushing
under rear mount
Hairpin Clip
3/8” x 1-3/4” Clevis Pin
Hairpin Clip
Gate Bracket
Front Mount
3/8” x 3/16” Delrin Bushing
under front mount
Clamp
Gate in the
OPEN POSITION
Pinch Area
2" minimum