Soleus kfhhp-22 Guía Del Usuario

Descargar
Página de 26
 
- 20 -
 
 
 
               
Installation 
 
 
Air Purging and Leakage Test
 
 
1.  Connect charging hose of manifold value to 
charging end of low pressure valve (both 
high/low pressure valves must be tightly shut). 
2.  Connect joint of charging hose to vacuum pump. 
3.  Fully open handle of Lo manifold valve. 
4.  Open the vacuum pump to evacuate.  At the 
beginning, slightly loosen joint nut of low 
pressure valve to check if there is air coming 
inside.  (Valve of vacuum pump changes from 
negative to 0) Then tighten this nut. 
5.  After finishing evacuation, shut Lo handle of 
manifold valve to stop the vacuum pump. 
(1) Keep evacuating for 15 minutes and make sure the reading of multi-meter is -1.0 x 14.5 PSI 
(-76cmHg). 
6.  Fully open high/low pressure valves. 
7.  Remove charging hose from charging end of low pressure valve. 
8.  Tighten bonnet of low-pressure valve.