Bunn FMD-1 Guía Del Usuario

Descargar
Página de 43
18
BALLAST - FMD-1 & FMD-2
P1666
FIG. 8 BALLAST 
SERVICE (cont.)
AUGER DRIVE COMPONENTS - FMD-2 (cont.)
Auger Drive  Motor (Refer to Fig. 5 or 6)
1.  Remove all hopper assemblies (20) and set aside 
for reassembly.
2.  Remove the four #8-32 screws securing the hopper 
support plate (19), remove plate and set aside for 
reassembly.
3.  Remove the four #8-32 locking screws, located 
inside the dispenser housing on the front of the 
auger motor mounting panel (14), securing auger 
motor  mounting  bracket  (15)  and  auger  motor 
(16) to the rear of the auger motor mounting panel 
(14).
4.  Disconnect the wires from the auger motor (16) 
to be removed.
5.  Remove auger motor mounting bracket (15), auger 
motor (16) and dust seal (17) as an assembly.
6.  Remove dust seal (17) from auger motor (16).
7.  Remove the four #8-32 screws securing the auger 
motor to the auger motor mounting bracket.
8.  Remove auger motor and discard.
9.  Using four #8-32 screws install new auger motor 
(16) on mounting bracket (15).
10. Install dust seal (17) on auger motor shaft.
11. Using four #8-32 locking screws install auger mo-
tor, dust seal and mounting bracket to the rear of 
the auger motor mounting panel (14)
12. Reconnect the wires to the terminals on the auger 
motor.
13. Install hopper support plate (19) and all hopper 
assemblies (20).
14. Refer to Fig. 7 when reconnecting wires.   
LEFT 
RIGHT
RED to WHI/RED from
Control Board J3-3
RED to WHI/ORN from 
Control Board J3-2
BLK to GRN from
Control Board J3-4
BLK to GRN from
Control Board J3-4
P1639
FIG. 7 AUGER MOTOR TERMINALS
J1
P1665
FMD-1
FMD-2
29112 101598