Siemens ProLINE-RoadRunner Manual De Usuario

Descargar
Página de 58
4 8
ProLINE-RoadRunner Operator’s Guide 
A
Run the Self-Test procedure 
approximately once a week.
To run the Self-Test procedure:
1. Press 
Pause.
2. Clear all devices from the 
sockets and from the conveyor 
belt.
3. Toggle the power switch off and 
then back on.
The Self-Test will run, checking 
the condition of the 
components.
4. Check the display for system 
errors.
„
Running the Self-Test
1
> Job
Advance Pocket
Align Pocket
3