APC AR201 Guia De Especificaciones

Descargar
Página de 2
Open Frame 2 - Post NetShelter
 Rack 
Installation
AR200, AR201
Inventory
NOTE: The mounting hardware is enclosed in a separate bag, located inside one of the 
packaging inserts glued to the main carton.
Tools Required (not provided)
1.5 x 1.5 in. Top 
Angle Open Frame (2)
3/8-16 x 3/4 in. 
Hex Head Bolt (12)
3 in. Vertical 
Upright Rail (2)
3.5 x 6 in. Bottom 
Angle Open Frame (2)
3/8 in. Split Lock 
Washer (12)
#12-24 Pan 
Head Screw (24)
Crescent Wrench
Hex Socket Torque Wrench