BandRich Inc. 35M168 Manual De Usuario

Descargar
Página de 68
Installation 
6
 
 
Important Installation Considerations 
Before installing the outdoor CPE, consider the appropriate location, 
clearance, and device orientation. 
Location and Cable wiring 
1.  Consult your Service Provider to find the best location and angle for getting the 
strongest signal from the base station. 
2.  Do a walking test around the house to find the best spot with the strongest signal 
if you don’t obtain related information from Service Provider. 
3.  Mount the CPE at the highest possible location with a clear view of the base 
station signal source. Buildings or other obstructions will affect the quality of the 
signal you receive. 
4.  Keep the best distance as possible from other devices that may cause 
interference. 
5.  Check if you can route the cable through the available ventilation holes to avoid 
unnecessary drilling and waterproofing the wall. 
 
6.  Disconnect the power cord first before mounting the CPE. Otherwise this may 
result in personal injury due to electric shock.