Culligan International Company 01020553 Manual De Usuario

Descargar
Página de 74
Installation of Accessories
 
Installation of Accessories 
34
 33
  CULLIGAN GLOBAL ELECTRONIC CONTROLLER
Installation of the Smart Brine Tank (SBT) Probe
After the Smart Brine Tank Probe is installed, it is necessary to configure some settings.
From the home screen, press the 
DOWN
 arrow to 
ACCESSORIES
.  Press the 
CHECK
 
MARK
 button.
Press the 
DOWN
 arrow key to scroll to 
SBT
 
SENSOR
. Press the 
CHECK
 
MARK
 button at 
SBT
 
SENSOR
.
Press the 
CHECK
 
MARK
 button to change 
SBT
 
SENSOR
 setting.  Press the 
UP
 or 
DOWN
 
arrow to change from 
NOT INSTALLED
 to 
INSTALLED
.  Press the 
CHECK
 
MARK
 when 
the correct 
SBT
 
SENSOR
 mode is displayed.
Press the 
CHECK MARK
 button to set 
BRINE TANK AREA
 setting.  Press the 
UP
 or 
DOWN
 arrow to change 
AREA SQ/IN
.  See chart below for correct 
BRINE TANK 
AREA
:
18 x 38 Brine Tank - 250 sq in 
39 x 48 Brine Tank - 1190 sq in
24 x 40 Brine Tank - 450 sq in 
42 x 48 Brine Tank - 1380 sq in
24 x 50 Brine Tank - 450 sq in
30 x 50 Brine Tank - 700 sq in
Press the 
CHECK MARK
 when the correct 
BRINE TANK AREA
 is displayed.
Press the 
CHECK MARK
 button to change 
SALT GEOMETRY
 setting.  Press the 
UP
 or 
DOWN
 arrow to change from 
PELLET, ROCK OR BRICK
.  Press the 
CHECK MARK
 
when the correct 
SALT GEOMETRY
 is displayed.
 > 4) accessories
system ok
7:32 am 2-1-08
 > 5) sbt sensor
sbt sensor
>installed
salt geometry
>pellet
brine tank area
>500 sq/in
Installing the Smart Brine Tank (SBT Probe) in to the Brine Tank
1. Place the smart brine probe on top of the brine plate as shown in Figure 24 .
2.  Loop the two zip ties thru the holes in the probe housing and loop the zip ties around the outside of the brine well as shown 
in Figure 25. IMPORTANT! Tighten zip ties securely to prevent movement.
3. Use zip tie to snug the top of the brine tank probe against the top of the brine well.
4.  Route the smart brine tank probe cable to an appropriate opening in the valve control housing. Use the strain-relief plug 
provided with the SBT probe for installation.
5. Plug the SBT probe connector into the circuit board at the position labeled “Brine Tank” - Figure 26.
Figure 24
Figure 25
Figure 26