Binsfeld Engineering Inc TX10K-LP Manual De Usuario

Descargar
Página de 44
- 39 - 
 
Appendix D: Strain Gage Application 
 
(Also refer to instruction bulletin B-127-12 provided with GAK-2-
200 Strain Gage Application Kit from Vishay Measurements 
Group, Inc., Raleigh, NC, 919-365-3800, 
www.measurementsgroup.com.) 
 
PREPARING THE SURFACE 
 
1.  A 3-inch square area will be used for gaging. Scrape off 
any paint or other coatings and inspect shaft for oil 
residue. If necessary, use a degreasing solution or 
isopropyl alcohol to remove. 
 
2.  Rough sand the gaging area with 220 grit paper. Finish 
the sanding procedure by wetting the gaging area with M-
Prep Conditioner A 
and the wetted surface with 400 grit 
paper
 provided. Rinse by squirting with M-Prep 
Conditioner A
. Wipe the area dry with tissue taking care 
to wipe in only one direction. Each time you wipe use a 
clean area of the tissue to eliminate contamination. 
 
3.  Rinse shaft this time by squirting with M-Prep Neutralizer 
5A. Wipe the gaging area dry with a clean tissue, wiping in 
only one direction and using clean area of tissue with each 
wipe. Do not allow any solution to dry on the surface as 
this may leave a contaminating film which can reduce 
bonding. Surface is now prepared for bonding. 
 
MARKING THE SHAFT FOR GAGE ALIGNMENT 
 
4.  The gage needs to be perpendicular to the shaft axis. In 
general, this can be accomplished by eye since 
misalignment of less than 4 degrees will not generate 
significant errors. For higher precision, we recommend 
two methods for marking the shaft: 
a)  Use a machinist square and permanent marker or 
scribe for perpendicular and parallel lines; or 
b)  Cut a strip of graph paper greater than the 
circumference of the shaft. Tape it to the shaft while 
lining up the edges. Mark desired gage position with a 
scribe or permanent marker.