Cisco CallManager RTU License for Single IP Phone 7911 SW-CCM-UL-7911= Manual De Usuario
Los códigos de productos
SW-CCM-UL-7911=
Product Bulletin
All contents are Copyright © 1992–2006 Cisco Systems, Inc. All rights reserved. This document is Cisco Public Information.
Page 1 of 3
End-of-Sale and End-of-Life Announcement for the Cisco
Unified IP Phone 7912G
Unified IP Phone 7912G
EOL5096–Amended
Cisco
®
announces the end-of-sale and end-of life dates for the Cisco Unified IP Phone
7912G. The last day to order the Cisco Unified IP Phone 7912G is May 26, 2007.
Customers with active service contracts will continue to receive support from the Cisco
Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1
describes the end-of-life milestones, definitions, and dates for the Cisco Unified IP Phone
7912G. Table 2 lists the product part numbers affected by this announcement
Customers are encouraged to migrate to the Cisco Unified IP Phone 7911G, which has been
shipping since December 2005. Table 2 provides relevant information for migrating to the
replacement product.
Table 1.
End-of-Life Milestones and Dates for the Cisco Unified IP Phone 7912G.
Milestone
Definition
Date
End-of-Life
Announcement Date
Announcement Date
The date the document that announces the end of sale and end of life of a
product is distributed to the general public.
product is distributed to the general public.
September 25, 2006
End-of-Sale Date
The last date to order the product through Cisco point-of-sale
mechanisms. The product is no longer for sale after this date.
mechanisms. The product is no longer for sale after this date.
May 26, 2007
Last Ship Date:
App. SW, HW
App. SW, HW
The last-possible ship date that can be requested of Cisco and/or its
contract manufacturers. Actual ship date is dependent on lead time.
contract manufacturers. Actual ship date is dependent on lead time.
August 24, 2007
End of SW Maintenance
Releases Date:
App. SW
Releases Date:
App. SW
The last date that Cisco Engineering may release any final software
maintenance releases or bug fixes. After this date, Cisco Engineering will
no longer develop, repair, maintain, or test the product software.
maintenance releases or bug fixes. After this date, Cisco Engineering will
no longer develop, repair, maintain, or test the product software.
May 25, 2008
End of Routine Failure
Analysis Date:
HW
Analysis Date:
HW
The last-possible date a routine failure analysis may be performed to
determine the cause of product failure or defect.
determine the cause of product failure or defect.
May 25, 2008
End of New Service
Attachment Date:
App. SW, HW
Attachment Date:
App. SW, HW
For equipment and software that is not covered by a service-and-support
contract, this is the last date to order a new service-and-support contract
or add the equipment and/or software to an existing service-and-support
contract.
contract, this is the last date to order a new service-and-support contract
or add the equipment and/or software to an existing service-and-support
contract.
May 25, 2008
End of Service Contract
Renewal Date:
App. SW
Renewal Date:
App. SW
The last date to extend or renew a service contract for the product.
August 21, 2009
End of Service Contract
Renewal Date:
HW
Renewal Date:
HW
The last date to extend or renew a service contract for the product.
August 21, 2011
Last Date of Support:
HW
HW
The last date to receive service and support for the product. After this
date, all support services for the product are unavailable, and the product
becomes obsolete.
date, all support services for the product are unavailable, and the product
becomes obsolete.
May 24, 2012
Last Date of Support:
App. SW
App. SW
The last date to receive service and support for the product. After this
date, all support services for the product are unavailable, and the product
becomes obsolete.
date, all support services for the product are unavailable, and the product
becomes obsolete.
May 25, 2010
HW = Hardware
OS SW = Operating System Software App. SW = Application Software