Burris Server LH 6000 Manual De Usuario

Descargar
Página de 48
Chapter 1 
Introduction 
 
5.  Remove the plastic lock pawl (which engages and secures the bezel lock 
mechanism) from the NetServer chassis front. Unfasten the control panel 
from the chassis, reorient it, and then secure it to the chassis again. Install 
the control panel bezel. 
 
6.  Install the slides in the rack, and install the NetServer in the rack. 
 
7.  Replace the power supply modules and hard disk drives. 
 
8.  For shipping HP racks, install the rack chassis retention bracket to secure 
the NetServer to the rear of the rack. 
 
9.  Install the bezel mounting hardware, and install the new front bezel. 
 
10.  Install the Cable Management Arm. 
 
11.  Reconnect the AC power cord(s) and other external cables. 
Warnings 
Observe the warnings below to prevent harm to you or the NetServer. Also 
observe all cautions and warnings in this document and other documents to protect 
people, the NetServer, components, and other equipment. 
WARNING 
Before removing the cover, always disconnect the power 
cord(s) and unplug telephone cables. Disconnect the power 
cord(s) to avoid exposure to high energy levels that may cause 
burns when parts are short-circuited by metal objects, such as 
tools or jewelry. Disconnect telephone cables to avoid 
exposure to shock hazard from telephone ringing devices. 
Note that the power switch does not turn off the standby 
power. Disconnect the power cord(s) to turn off standby 
power. If the backlight on the LCD display is on, standby 
power is still on.