Graco 16P957 Manual De Usuario

Descargar
Página de 34
Supply System Operation
3A2798D
11
Start and Adjust Ram
1.
Set platen configuration based on pail type (see 
Adjust Spacers, page 13).
2.
Refer to F
IG
. 1 and F
IG
. 2. Close all air regulators 
and air valves.
3.
Open main air slider valve (BA) and set ram air reg-
ulator (BB) to 45 psi (0.31 MPa, 3.1 bar). Set direc-
tor valve handle (BC) to UP and let the ram rise to 
its full height.
4.
Remove the drum cover.
5.
Put a full drum of fluid on the ram base, slide it back 
against the drum stops, and center it under the 
platen (D). See F
. 9.   
6.
Remove bleed stick from platen bleed port (J). 
NOTE: Some pails may require the spacer (EG) to 
be flipped upside down so the smaller diameter side 
is on the bottom. If unable to get ram into the pail, 
see Remove and Reinstall Wiper on page 14 t
re-install the spacer upside down.
7.
Set the director valve (BC) to DOWN and lower the 
ram until fluid appears at the top of the platen bleed 
port (J). Adjust ram air regulator (BB) as needed. 
Set the director valve (BC) to neutral and close the 
platen bleed port (J). 
Start and Adjust Pump
1.
Start and Adjust Ram, page 11. Keep the director 
valve (BC) set to DOWN while pump is operating.
2.
Be sure the main air slider valve (BA) is closed. 
Then set the ram air regulator (BB) to about 
40-45 psi (0.28-3.1 MPa, 2.8-3.1 bar). Set the direc-
tor valve (BC) to DOWN. 
3.
Open main air slider valve (BA). Use air motor 
regulator (BE) to slowly increase pressure until 
pump operates at desired flow rate.
NOTE: Increase air pressure to the ram if the pump 
does not prime properly with heavier fluids. 
Decrease Ram air pressure if fluid is forced out 
around the top seal or platen.
Moving parts can pinch or amputate fingers. When 
the pump is operating and when raising or lowering 
the ram, keep fingers and hands away from the 
pump intake, platen, and lip of the drum.
NOTICE
To avoid damage to the platen seals, do not use a 
drum that is dented or damaged.
F
IG
. 9
J
D
ti20247b
To prevent equipment rupture, be sure all 
components are adequately sized and pressure rated 
to meet the system’s requirements.