Perlick 63134-4 Manual De Usuario

Descargar
Página de 8
4
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
How to Operate – 
Beer Pump Panels 
Adjust primary CO
2
regulator by turning 
adjusting screw counterclockwise until it turns
freely, then turn hand valve counterclockwise on
CO
2
cylinder to the fully open position. Next, turn
regulator adjusting screw clockwise until desired
pressure is reached.
Note: If CO
2
is only being used for keg-   
applied pressure, adjust to approximately 
40 psig. If CO
2
is being used to supply 
beer pumps, adjust to the required system
pressure plus an additional 15 psig.
Adjust the air compressor output regulator
pressure to a minimum of 15 psig. greater than
the maximum required system pressure required
to operate the beer pumps. Maximum setting
100 psig.
Adjust secondary CO
2
regulator which 
supplies the keg pressure located on the 
beer pump panel to the proper pressure 
setting. Setting depends on beer brand and 
temperature. Desired goal is to maintain the 
natural carbonation in the beer. Open the shut-
off valves.
Ensure the Probe Valve on the Perlick Smart
Coupler is in closed position. 
See figure 1
.
Ensure the Beer Pump Flow Reversal/Dispense 
handle is in the dispense position. Adjust the
Secondary Air/ CO
2
regulator located on the
beer pump panel to a minimum operating 
pressure of 10 psig.
Connect the coupler to a regulated water supply
with pressure less than 30 psig. Note: Pump
damage may occur with pressure higher
than 30 psig.
Open the water supply. Then open probe valve
on Perlick Smart coupler to the 45° position.
See figure 2.
The beer pump will slowly pump
up the beer line in the trunk housing to set psig.
Note: If pump continues to run for longer than
expected, check lines for possible leaks at one
or more of the connections.
Gradually increase secondary regulator 
pressure to the designed system pressure to
achieve a flow rate of one gallon per minute
from the dispensing head. Note: Maximum
beer pump operating pressure is 90 psig.
Open dispensing head faucet to purge air
trapped within the tubing.
Check all gas and liquid line fittings and 
connections for leaks.
Close probe valve on Perlick Smart Coupler.
(See figure 1)
and disconnect coupler from 
regulated water source.
Clean beer system. After cleaning and rinsing 
the system, make sure the beer line is full of 
cold water (beer dispensing from warm beer 
lines will be poor quality).
Tap fresh keg with Perlick Smart Coupler. Open
dispensing head faucet until clear beer flows.
Figure 1
Closed Position
Figure 2
45° or Cleaning Position
Figure 3
Open Position
Smart Coupler Probe Valve Lever Positions