KitchenAid DVM-1815 Manual De Usuario

Descargar
Página de 52
14
2. Securely attach one or two 2 in. x 4 in. x 32 in. 
(5 cm x 10 cm x 81 cm) wood boards to wall studs behind 
refrigerator. Use 6 - #8 x 3 in. (7.6 mm) (or longer) wood 
screws.The wood screws must be screwed into the studs at 
least 1½ in. (3.8 cm). The board(s) must overlap the 
compressor cover. 
1. Center board 
¹⁄₄ 
 in. (6 mm) max. above refrigerator 
2. Two, 2 in. x 4 in. x 32 in. (5 cm x 10 cm x 81 cm) boards
3. Attach to studs with 6 -#8 x 3 in. (7.6 cm) screws
4. Compressor cover
Install New Water Line 
(if required)
Tools required: Standard screwdriver, 
⁷⁄₁₆ in. and ¹⁄₂ in. open-end 
wrenches or two adjustable wrenches, 
¹⁄₄ in. nut driver and drill 
bit, hand drill or electric drill (properly grounded).
1. Unplug refrigerator or disconnect power. 
2. Turn OFF main water supply. Turn ON nearest faucet long 
enough to clear line of water.
3. Find a ½ in. to 1
¹⁄₄ in. (12.7 mm to 3.18 cm) vertical COLD 
water pipe near the refrigerator.
NOTE: Horizontal pipe will work, but drill on the top side of 
the pipe, not the bottom. This will help keep water away from 
the drill and normal sediment from collecting in the valve.
4. Determine the length of copper tubing you need. Measure 
from the connection on the lower left rear of refrigerator to the 
water pipe. Add 7 ft. (2.1 m) to allow for cleaning. Use 
¹⁄₄ in. 
(6.35 mm) O.D. (outside diameter) copper tubing. Be sure 
both ends of copper tubing are cut square. 
5. Using a grounded drill, drill a 
¹⁄₄ in. hole in the cold water pipe 
you have selected.
 
6. Fasten the shutoff valve to the cold water pipe with the pipe 
clamp. Be sure the outlet end is solidly in the 
¹⁄₄ in. drilled hole 
in the water pipe and that the washer is under the pipe clamp. 
Tighten the packing nut. Tighten the pipe clamp screws 
carefully and evenly so washer makes a watertight seal. Do 
not overtighten or you may crush the copper tubing. 
7. Slip the compression sleeve and compression nut on the 
copper tubing as shown. Insert the end of the tubing into the 
outlet end squarely as far as it will go. Screw compression nut 
onto outlet end with adjustable wrench. Do not overtighten. 
8. Place the free end of the tubing in a container or sink, and 
turn ON the main water supply. Flush the tubing until water is 
clear. Turn OFF the shutoff valve on the water pipe. Coil the 
copper tubing.
9. Route copper tubing to the refrigerator.
Connect Water Line to Refrigerator
1. Remove the shipping tape from gray, coiled water tubing on 
the rear of the refrigerator. 
2. Before attaching copper tubing to refrigerator, flush at least 2 
quarts (1.9 L) of water through the copper tubing and into a 
bucket to get rid of any particles in the water line. 
3. Check for leaks around the saddle valve. Do not overtighten 
clamp or sleeve. This will crush copper tubing.
4. Make connection to refrigerator. 
Style 1 - Connecting to a Water Line:
Additional Parts Needed: Coupling, ferrule and nut. 
Slide the purchased nut then the purchased ferrule onto the 
tubing. Push the tubing into the purchased coupling as far as it 
will go. Slide the nut and ferrule forward. Tighten the nut by hand. 
Then tighten it with a wrench two more turns. Do not overtighten.
Style 2 - Connecting to a Water Valve: 
NOTE: The water shutoff should be located in the base cabinet 
on either side of the refrigerator. The right-hand side is 
recommended. The access hole through the right cabinet must 
be within 
¹⁄₂ in. (12.7 mm) of rear wall.
Push the bulb end of the tubing into the water valve as far as it 
will go. Slide the nut forward and finger tighten. Tighten the nut 
by hand. Then tighten it with a wrench two more turns. Do not 
overtighten
1. Bulb                                                                                                                                                                             
2. Nut (provided)
5. Turn shutoff valve ON. Check for leaks. Tighten any nuts or 
connections (including connections at the valve) that leak.
1. Cold Water Pipe
2. Pipe Clamp
3. Copper Tubing
4. Compression Nut
5. Compression Sleeve
6. Shutoff Valve
7. Packing Nut
2
1
3
2" (5 cm)
4
1. Line to Refrigerator
2. Nut (provided)
3. Bulb
4. Coupling (purchased)
5. Ferrule (purchased)
6. Nut (purchased)
1
2
3
4
5
6
1
2