Graco TI12553a Manual De Usuario

Descargar
Página de 134
Meter Calibration 
100
312779E
Meter Calibration
Calibrate the meter:
The first time the system is operated.
Whenever new materials are used in the system, 
especially if the materials have viscosities that differ 
significantly.
At least once per month as part of regular mainte-
nance.
Whenever a flow meter is serviced or replaced.
NOTE: 
K-factors on the Calibration Screen are 
updated automatically after the calibration pro-
cedure is completed. 
K-factor values on the screen are viewable only. 
If needed, you can manually edit the K-factors 
in Advanced Setup Screen 4 (see page 41) or 
Recipe Setup Screen 5 (page 46).
All values on this screen are in cc, independent 
of the units set in Configure Screen 1.
The controller will use the active recipe 
K-factors for meter calibration. The active recipe 
must be recipe 1 to recipe 60. Recipes 0 and 61 
do not have K-factor values.
1.
Before calibrating meter A or B, prime the system 
with material. For a color/catalyst change system, 
make sure the color/catalyst valve is open.
2.
Shut off all spray or dispense devices connected to 
the ProMix.
3.
Close both fluid shutoff valves and sampling valves. 
(Wall Mount Fluid Station only.)
4.
Place the beakers (minimum size - 250 cc) in hold-
ers. Put the sampling tubes into the beakers. (Wall 
Mount Fluid Station only.)
NOTE: If tubes need replacing, use 5/32 in. or 4 mm 
OD tubing. 
5.
On the EasyKey, press the Setup 
 key to access 
setup screens.
6.
Select Recipe & Advanced Setup and press the 
Enter 
 key to select.
7.
Press the Right Arrow 
 key to select the Cali-
 
the Enter 
 key to select 
either Dose Valve A or B. Press the Down Arrow 
 
key and select Start from the menu. Start only one 
at a time.
To avoid splashing fluid in the eyes, wear eye protec-
tion. The fluid shutoff valves and ratio check valves are 
retained by mechanical stops that prevent accidental 
removal of the valve stem while the manifold is pres-
surized. If you cannot turn the valve stems manually, 
relieve the system pressure, then disassemble and 
clean the valve to remove the resistance.