Jacuzzi 2 Wall and 3 Wall Manuel D’Utilisation

Page de 32
3 WALL:  TOWER AND CURVED GLASS INSTALLATION
STEP 9
Secure the rails.
STEP 10
Tighten the tower base bolt.  Two shut-off valves are
provided.  To hook up supply lines, unscrew valves from
braided line.  Using thread sealant, screw valve to stub
outs at bottom of tower.  Then reconnect braided line
using provided gasket.  Do not twist or kink supply lines
when connecting.
SHUT OFF
VALVES
(PROVIDED)
COLD
HOT
BOLT
STEP 11
Install cover cap on wall post.
STEP 12
Install glazing gasket on curved glass wall post on the
outside.  Note orientation of gasket.  Soapy water may
help to insert the glazing gasket. On the inside of
enclosure, apply sealant the entire length of glass and
wall post as well as the entire length of glass and tower.
COVER CAP
WALL POST
GLASS
GLAZING GASKET
INSIDE OF
ENCLOSURE
APPLY SEALANT
GLAZING
GASKET
INSIDE OF
ENCLOSURE
APPLY
SEALANT
TOWER TOP PLATE
21