Enterasys Networks 2000 Manuel D’Utilisation

Page de 86
Enterasys Xpedition 2000 Getting Started Guide
25
Installing the Hardware
Attaching console management cables
Attaching port cables 
Verifying Your Shipment
Before you begin installing your XP-2000, check your shipment to ensure that everything you 
ordered arrived securely. Enterasys assembles the XP-2000 according to one of the configurations 
described in Chassis
 before shipping.
Open the shipping box(es) and verify that you received the following equipment:
An XP-2000, power cord(s), and a console cable. The console cable is used for connecting a 
terminal to the XP-2000’s console port. 
One copy of the Enterasys Xpedition 2000 Getting Started Guide (the book you are reading 
now).
Rack mount kit, including two rack mounting brackets and fastening screws.
Depending on your order, your shipment will also contain the expansion modules you ordered.