Pitney Bowes DI200 Manuel D’Utilisation

Page de 49
21
OfficeRight™ DI200 
Operator’s Guide
Model Required: Your OfficeRight™
 DI200
 
must
have the optional Sheet Feeder A2.
Notes: This job uses the second sheet feeder
A2 in 2nd Page mode to feed two-sheet, collated
sets. Load sheets into the feeder in their collated
sequence: page one, page two, page one, page two and so on.
Step
Action
Tips
For More Details…
1
Make sure paper size
Choose 11” or 14”
Page 30
setting is correct
2
Load sheets into
Load face down
Page 10
Sheet Feeder A2.
and bottom edge first
See note above for
loading sequence
3
Load envelopes
Load right way up
Page 11
into Feeder B
and facing you
4
Press button to select
Make sure BOTH
Page 6, 7
Feeder A2 and 2nd
green indicators are lit
Page
5
Press button to select
Make sure green
Page 6, 7
Envelope Fdr B
indicator lights
6
Press button to choose
Make sure moistener
Page 6, 7
Seal or No Seal
has E-Z Seal
®
 or water
7
Press Trial Piece button
Trial piece will not
Page 6, 7
and check trial piece
seal—this is normal
8
Press Start button
Stop button will stop
Page 6, 7
to run job
machine at end of cycle
Problems? See 
Error Messages, page 33, and Troubleshooting, page 37
Job 6
envelope
2 folded sheets
        (collated)
Two Collated, Folded Sheets into an
Envelope
04 A5 p19-32
6/16/03, 4:33 PM
21