Cabletron Systems SEHI-22FL Mode D'Emploi

Page de 85
Connecting the SEHI to the Network
SEHI User’s Guide
5-11
5.1.6
Connecting an AUI Cable to an EPIM-X
Perform the following steps to connect an EPIM-X to a device not 
requiring SQE:
1. Check that the SQE LED on the EPIM-X is off. If the SQE LED is on, 
check the position of the SQE switch.
2. Attach one end of an AUI cable of up to 50 meters in length to the port 
Figure 5-6
The EPIM-X
!
C AUT IO N
The Signal Quality Error (SQE) switch remains in the OFF 
position for most network connections. However, some Data 
Terminal Equipment (DTE) requires SQE. Refer to a DTE 
manual for SQE requirement information.
NOTE
If the SQE light remains on, even though the SQE switch is in 
the OFF position, contact Cabletron Systems Technical 
Support.
OFF Position
(Toward Front
of EPIM)
ON Position
(Toward Back
of EPIM)
OFF
ON
1490_18
SEHI Book  Page 11  Friday, April 19, 1996  10:46 AM