Bunn 40410.0000G Manuel D’Utilisation

Page de 20
Page 5
PLUMBING REQUIREMENTS
These brewers must be connected to a cold water system with operating pressure between 20 and 90 psi  
(138 and 620 kPa) from a 
1
2
" or larger supply line.  A shut-off valve should be installed in the line before the 
brewer.  Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 
kPa).  The water inlet fitting is 
1
4
" flare.  Bunn-O-Matic does not recommend the use of a reverse-osmosis or 
deionized water supply to this equipment.
NOTE - Bunn-O-Matic recommends 
1
4
" copper tubing for installations of less than 25 feet and 
3
8
" for more than 
25 feet from the 
1
2
" water supply line.  A tight coil of tubing in the water line will facilitate moving the brewer to 
clean the countertop.  Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer.  The 
size and shape of the hole made in the supply line by this type of device may restrict water flow.
NOTE - If a backflow preventer is required by code, a shock arrestor should be installed between backflow pre-
venter and brewer. Installing the shock arrestor as close to brewer as possible will provide best results.
FIG 3
40410  042610
As directed in the International Plumbing Code of the International Code Council and the Food Code Manual 
of the Food and Drug Administration (FDA), this equipment must be installed with adequate backflow pre-
vention to comply with federal, state and local codes. For models installed outside the U.S.A., you must 
comply with the applicable Plumbing /Sanitation Code for your area.
Plumbing Hook-Up
1.  Remove the shipping cap from the fitting on the rear of the brewer.
2.  Securely attach adaptor elbow assembly to the fitting at the rear of the brewer.
3.  Flush the water line and securely attach it to the adaptor elbow.
4.  Turn on the water supply.