Raritan P2-UMT832M Mode D'Emploi

Page de 116
C
HAPTER 
6:
 
C
ONFIGURATIONS
 
69 
 
 
 
Chapter 6: Configurations  
The aim of the UMTM (Main) and UMTS (Stacking) units is to allow users to build the Paragon 
system to include additional channel ports and the tiers up to three levels, so that more users and 
channels can be configured to control more targets. The system does not need to be over-
redundant in accessibility, but administrators should consider the configurations illustrated in this 
chapter. In more complex stacked Paragon setups, there are important guidelines about legal and 
illegal device configurations that must be followed to ensure functionality.  
 
Principles of Re-Connection 
When a change is made to a connected tiered device, we recommended that power to all devices 
is recycled, if possible. This includes the device where the connection is changed directly, as well 
as all devices below it in the system architecture. 
•  The sequence of power recycling should start from highest tiered device and end with the 
Main base unit. For example, in a “Single Base” configuration (only one UMT Matrix Switch 
as the base unit), if a connection change is made at a device on the third tier, the sequence of 
power recycling should be as follows: 
−  The third tier device with the changed connection 
−  The second tier device connected to the third tier device 
−  The base unit