Bunn LCR-2 Mode D’Emploi
5
PLUMBING REQUIREMENTS
The dispenser may be connected to a cold or hot water system (140°F Max.) with operating pressure between
20 and 90 psi (138 and 620 kPa) from a 1/2” or larger supply line. A shut-off valve should be installed in the line
before the dispenser. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to
50 psi (345 kPa). The water inlet fitting is 3/8” flare. Dispensers set up to deliver to 1.8 Oz./sec. (53.2 ml/sec)
per dispense tip, require a water supply source that can deliver a minimum of 1.7 gpm (6.4 lpm) at the inlet
fitting. Dispensers set up to deliver 2.6 Oz./sec. (76.9 lpm) per dispense tip, require a water supply source that
can deliver a minimum of 2.4 gpm (9.2 lpm) at the inlet fitting.
NOTE: Bunn-O-Matic recommends 3/8” tubing from the 1/2” water supply line. At least 18 inches of FDA
approved flexible beverage tubing, such as reinforced braided polyethylene or silicone, before the dispenser will
facilitate movement to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to
install the dispenser. The size and shape of the hole made in the supply line by this type of device may restrict
water flow.
36026 031307
This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials
and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the
Food and Drug Administration (FDA). For models installed outside the U.S., you must comply with
the applicable Plumbing/Sanitation Code for your area.
ELECTRICAL REQUIREMENTS (Cont.)
CAUTION: The dispenser must remain disconnected from power source until specified in Electrical Hook-Up.
The LCR-2A 3 Phase dispenser is internally wired from the factory for 400 Volts AC Phase to Phase, 230 Volts
AC Phase to Neutral, 3 Phase 50/60 Hz. It requires a 4-wire, grounded, individual branch circuit rated for 400
Volts AC, Three Phase, 50/60 Hz. At Three Phase operation, each Phase will have approximately 13.5-14.0
Amps flow through it.
The LCR-2A 3 Phase dispenser can be Field Wired for 230 Volts AC, Single Phase applications. This requires
a 2-wire, grounded, individual branch circuit rated for 230 volts AC, Single Phase, 50/60 Hz. At Single Phase
operation, the machine will have approximately 27.5 Amps flow through it.
NOTE: The internal terminal block must be rewired for 230 Volts AC, Single Phase applications, (see Optional
Field Wiring Diagram).
L1
L2
L3
N
L1
FOR 3-PHASE OPERATION
CONNECT INPUT WIRING TO
L1,L2,L3 & N AS SHOWN.
FOR 1-PHASE/20 AMP. OPERATION
CONNECT INPUT WIRING TO
L1 & N AS SHOWN.
N
RED
BRN
BLU
TERMINAL
BLOCK
TERMINAL
BLOCK
TO MACHIN
E
FROM POWER SOURCE
TO MACHIN
E
FROM POWER SOURCE
L1
L2
L3
N
BLK
RED
BRN
BLK
BRN
BLU
L2
L3
BLK
L1
L2
L3
N
L1
N
RED
BLU
TO MACHIN
E
FROM POWER SOURCE
L1
N
FOR 1-PHASE/30 AMP. OPERATION MOVE
BLACK WIRE INTO TERMINAL BLOCK WITH
BROWN WIRE, CONNECT INPUT WIRING
TO L1 & N AS SHOWN.
CE REQUIREMENTS
• This appliance must be installed in locations where it can be overseen by trained personnel.
• For proper operation, this appliance must be installed where the temperature is between 0°C to 35°C.
• Appliance shall not be tilted more than 10° for safe operation.
• An electrician must provide electrical service as specified in conformance with all local and national codes
• This appliance must not be cleaned by water jet
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or
mental capabilities, or lack of experience and knowledge, unless they have been given instructions concern-
ing use of this appliance by a person responsible for its safety.