Bunn smartwave aps Mode D'Emploi

Page de 18
Page 4
ELECTRICAL REQUIREMENTS
CAUTION - The brewer must be disconnected from the power source until specifi ed in Initial Set-Up.
All 120V models have an attached cordset and plug. 
Model 15 requires 2-wire grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz.
Model 35 requires 3-wire, grounded service rated 220-240 volts ac, 10 amp, single phase, 50/60 Hz. 
Electrical Hook-Up
CAUTION – 
Improper electrical installation will damage electronic components.
1. 
An electrician must provide electrical service as specifi ed.
2. 
Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. 
If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing 
has been hooked up, the brewer is ready for Initial Set-Up.
Model 35 requires 3-wire, grounded service rated 
120/208 or 120/240 volts ac, 20 amp, single phase, 60 
Hz.  Proceed as follows:
Model 15 has an attached cordset and requires 
2-wire grounded service rated 120 volts ac, 15 amp, 
single phase, 60 Hz.
N
L1 
L2 RED 
L2 RED
WHITE 
GREEN GREEN 
NEUTRAL 
L1 BLACK 
WHITE 
NEUTRAL 
L2
L1 BLACK 
120V. A.C.
120V. A.C.
208 or 240V. A.C.
FIG 1
FIG 2
40410  092407
Electrical Hook-Up
CAUTION – 
Improper electrical installation will damage electronic components.
1. 
An electrician must provide electrical service as specifi ed.
2. 
Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. 
Remove the front panel beneath the sprayhead.
4. 
Feed the cord through the strain relief and connect it to the terminal block.
5.  Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.  
Replace the front panel.
6. 
If plumbing is to be hooked up later be sure the brewer is disconnected from the power source.  If plumbing 
has been hooked up, the brewer is ready for Initial Set-Up.