Honeywell herculine 2000 Manuel D’Utilisation

Page de 128
Troubleshooting 
Troubleshooting Procedures 
Revision 7 
  HercuLine™ 2000 Series Actuator - Installation, Operation and Maintenance Manual 
109 
7/08  
 
 
Test Power Distribution PWA 
 
 
Replace CPU
assembly.
Is correct
voltage present
at test points?
See below.
Remove top
cover of actuator.
Are fuses good?
Replace fuses with
same type and
rating
Yes
D
Check Fuses F1
and F2 on the
power distribution
PWA.
No
Yes
No
Replace Power
Distribution PWA.
 
 
Figure 44 Test Power Distribution PWA 
Power Distribution PWA Test Points 
 
Connector 
Test Points   -   Pins 
Voltage 
J2 
Pin 1 to pin 7 
5 V 
J3 
Pins 1,2 to pins 3, 4, 8 
Pins 3, 4 to pin 7 
5 V 
9 V 
J1 
Pins 5, 6 to pins 7, 8 
Pins 1, 2 to pins 7, 8  
24 V 
28 V  + or – 3V